Yeshiva Toras Yisroel
Large View

Yeshiva Toras Yisroel

1367 Lanes Mill Road

  

Project Goals

 

Creation of a yeshiva high school building

 

  • 16,000 SF building on a 2.5-acre site
  • Infrastructure for 2 more buildings (approval was given for these)
  • Building and landscaping should fit in well with the surroundings

 

Project Duration
  • 9 months
  • Start date: December 2018
  • Occupancy Date: August 2019

 

Overview

 
The construction of Yeshiva Toras Yisroel required both thought-out planning and exceptional efficiency. Regency Development took great care to ensure that the yeshiva blends in beautifully with the neighborhood. Gorgeous shrubbery frames the property and the location of the actual structure was planned with consideration to the concerns of its neighbors. With an eye towards the future, infrastructure was developed for two additional, pre-approved buildings, inclusive of utility upgrades, a parking lot, and a storm drainage system. The entire project, including the yeshiva dorm, was completed in just nine months, from the time of excavation until the move-in date.