40,000 Sf open warehouse
• two story school building, block and steel construction
• extensive site work
• new utility installation
Halfway through the gut renovation, the clients approached Abe Auerbach with a somewhat bizarre request. They had found a potential tenant to lease the second floor of the new school building, which would be a financial boon. There was just one little hitch. The original plans only called for one story, and the project was halfway through.
Never one to turn down a challenge, Abe went back to the drawing board- quite literally- and had the architect update all the plans, including the addition of an elevator. Within days, the Regency team was operating on the updated timetable, ordering additional materials and HVAC units, and reconfiguring utility lines.
Only one detail was left unchanged; the final deadline. New floor or not, school was scheduled to start in mid-August and the building would have to be ready. And it was, less than five months after tractor touched ground!
Regency Development is a large-scale construction firm dedicated to guiding owners and managers through the development process. With an all-encompassing suite of services that goes far beyond actual construction, Regency steers each project toward its efficient conclusion. From assistance with analyzing the potential of the deal all the way to leasing spaces, clients enjoy an unusually streamlined process.